In November 2024, the San Francisco 49ers approached Almaden to produce custom signage for their partner, Graton Resort & Casino. The goal was to deliver bold large format signage inside Levi’s® Stadium.

In November 2024, the San Francisco 49ers approached Almaden to produce custom signage for their partner, Graton Resort & Casino. The goal was to deliver bold large format signage inside Levi’s® Stadium.

12

12

Silicone Edge Graphics

900+ sq ft

900+ sq ft

of branding

Under 5 hrs

Under 5 hrs

to install

4 weeks

4 weeks

project timeline

Two installers on ladders mounting Graton graphics above stadium windows
Two installers on ladders mounting Graton graphics above stadium windows

01

The Challenge

The Challenge

The Challenge

  • Seamless alignment of oversized graphics around complex corners.

  • Coordination between design and production to accommodate for frame orientation.

  • Custom framing systems to mount signage above rows of stadium TVs.

  • Seamless alignment of oversized graphics around complex corners.

  • Coordination between design and production to accommodate for frame orientation.

  • Custom framing systems to mount signage above rows of stadium TVs.

  • Seamless alignment of oversized graphics around complex corners.

  • Coordination between design and production to accommodate for frame orientation.

  • Custom framing systems to mount signage above rows of stadium TVs.

Installers fitting a large Graton fabric graphic onto its frame
Installers fitting a large Graton fabric graphic onto its frame

02

The Almaden Solution

The Almaden Solution

The Almaden Solution

Almaden installed a series of custom Silicone Edge Graphics (SEGs), tailored specifically to the stadium environment and designed to span seamlessly over all surfaces.

Almaden installed a series of custom Silicone Edge Graphics (SEGs), tailored specifically to the stadium environment and designed to span seamlessly over all surfaces.

Almaden installed a series of custom Silicone Edge Graphics (SEGs), tailored specifically to the stadium environment and designed to span seamlessly over all surfaces.

03

Materials & Production

Materials & Production

Materials & Production

  • Two intersecting SEGs spanning two intersecting walls, each measuring 346″ wide.

  • 10 custom SEG panels each measuring 251″ wide, suspended above a row of TV screens.

  • Custom aluminum extrusions specially manufactured to mount the SEGs above the screens.

  • Two intersecting SEGs spanning two intersecting walls, each measuring 346″ wide.

  • 10 custom SEG panels each measuring 251″ wide, suspended above a row of TV screens.

  • Custom aluminum extrusions specially manufactured to mount the SEGs above the screens.

  • Two intersecting SEGs spanning two intersecting walls, each measuring 346″ wide.

  • 10 custom SEG panels each measuring 251″ wide, suspended above a row of TV screens.

  • Custom aluminum extrusions specially manufactured to mount the SEGs above the screens.

Red Graton Resort & Casino graphics above the windows inside Levi's Stadium
Red Graton Resort & Casino graphics above the windows inside Levi's Stadium

04

Installation Process

Installation Process

Installation Process

Aluminum extrusions were mounted first, followed by SEG fabric graphics. Due to the sheer size, each SEG required a 2-person install team to ensure safe and smooth handling.

Graphics were printed using dye-sublimation for high-resolution photo quality and long-term durability. All installations were performed on-site by the Almaden team.

Aluminum extrusions were mounted first, followed by SEG fabric graphics. Due to the sheer size, each SEG required a 2-person install team to ensure safe and smooth handling.

Graphics were printed using dye-sublimation for high-resolution photo quality and long-term durability. All installations were performed on-site by the Almaden team.

Aluminum extrusions were mounted first, followed by SEG fabric graphics. Due to the sheer size, each SEG required a 2-person install team to ensure safe and smooth handling.

Graphics were printed using dye-sublimation for high-resolution photo quality and long-term durability. All installations were performed on-site by the Almaden team.

Two installers on ladders mounting Graton graphics above stadium windows
Two installers on ladders mounting Graton graphics above stadium windows

05

The Result

The Result

The Result

Ahead of the 2025–26 football season, the 49ers returned to Almaden to update Graton’s stadium signage with refreshed artwork. Building on the success of the original installation, Almaden replaced all existing SEGs using new artwork provided by Graton Resort & Casino. The updated graphics were installed using the existing aluminum extrusions and custom mounting brackets. Artwork templates were carefully adjusted to ensure proper alignment across intersecting walls, an improvement from the original install.

The new graphics were installed in under 5 hours, and all updated signage was completed and in place well before the 2025-26 season opener.

Ahead of the 2025–26 football season, the 49ers returned to Almaden to update Graton’s stadium signage with refreshed artwork. Building on the success of the original installation, Almaden replaced all existing SEGs using new artwork provided by Graton Resort & Casino. The updated graphics were installed using the existing aluminum extrusions and custom mounting brackets. Artwork templates were carefully adjusted to ensure proper alignment across intersecting walls, an improvement from the original install.

The new graphics were installed in under 5 hours, and all updated signage was completed and in place well before the 2025-26 season opener.

Ahead of the 2025–26 football season, the 49ers returned to Almaden to update Graton’s stadium signage with refreshed artwork. Building on the success of the original installation, Almaden replaced all existing SEGs using new artwork provided by Graton Resort & Casino. The updated graphics were installed using the existing aluminum extrusions and custom mounting brackets. Artwork templates were carefully adjusted to ensure proper alignment across intersecting walls, an improvement from the original install.

The new graphics were installed in under 5 hours, and all updated signage was completed and in place well before the 2025-26 season opener.

Finished Graton Resort & Casino fabric wall graphic
Finished Graton Resort & Casino fabric wall graphic
Finished Graton Resort & Casino fabric wall graphic
Two installers on ladders mounting Graton graphics above stadium windows
Red Graton Resort & Casino graphics above the windows inside Levi's Stadium
Installers fitting a large Graton fabric graphic onto its frame
Two installers on ladders mounting Graton graphics above stadium windows

With Almaden, it's done.

With Almaden, it's done.

With Almaden, it's done.

Let's Talk

Every physical expression of your brand.

Locations

South Bay · 2585 Scott Blvd, Santa Clara, CA · (408) 450-7910

North Bay · 361 Blodgett St, Cotati, CA · (707) 588-8028

Distribution Center · 2290 Cordelia Rd, Fairfield, CA

© 2026 Almaden Global

Every physical expression of your brand.

Locations

South Bay · 2585 Scott Blvd, Santa Clara, CA · (408) 450-7910

North Bay · 361 Blodgett St, Cotati, CA · (707) 588-8028

Distribution Center · 2290 Cordelia Rd, Fairfield, CA

© 2026 Almaden Global

Every physical expression of your brand.

Locations

South Bay · 2585 Scott Blvd, Santa Clara, CA · (408) 450-7910

North Bay · 361 Blodgett St, Cotati, CA · (707) 588-8028

Distribution Center · 2290 Cordelia Rd, Fairfield, CA

© 2026 Almaden Global

Every physical expression of your brand.

Locations

South Bay · 2585 Scott Blvd, Santa Clara, CA · (408) 450-7910

North Bay · 361 Blodgett St, Cotati, CA · (707) 588-8028

Distribution Center · 2290 Cordelia Rd, Fairfield, CA

© 2026 Almaden Global

Need something?

Ask our team

→